Home Categories Send inquiry

Brazil INMETRO certified Plug DB62

12A 16A 20A 250V

12A H05VV-F H05RN-F H05RR-F H07RN-F 3G1.0mm2

16A H05VV-F H05RR-F H07RN-F 3G1.0mm2

20A H05VV-F H05RR-F H07RN-F 3G2.5mm2

INMETRO certificate

MOQ: 500PCS

Delivery time: 30 Days after receive deposit
Payment Term: 30%TT as deposit, 70%TT before shipment or L/C At sight.

FAQ

1. Are you manufacture or trading company?
We are manufacture located in Ningbo City, we have 2 factories, one is mainly in producing Welding Machine, Welding Helmet and Car Battery Charger, Other company is for producing welding cable and plug.
2. Free Sample is available or not?
The sample for welding helemt and cables are free of charge, you just need pay for courier cost. You will pay for the welding machine and its courier cost.
3. How long can I expect the power cord (plug)?
It takes 2-3 days for sample and  4-5 working days by courier.
4. How long for mass product producing?
About 20 days.
5. Which certificate you have?
INMETRO , DEKRA.
6. What's your advantage compare with other manufacture?
We have whole set machines for producing welding mask. We produce the headgear and helmet shell by our own plastic extruders, painting and decal ourself, Produce the PCB Board by our own chip mounter, assemble and packing. As all the producing process is controlled by ourself, so can make sure steady quality.


  • Brazil INMETRO certified Plug DB62 Related Video: